Importance of Water Regulation in Wheat Raw Grain

Importance of Water Regulation in Wheat Raw Grain

Today we share with you the importance of water regulation in wheat.

The purpose of wheat water regulation is to increase the toughness of the cortex and keep the bran intact during processing. The embryo softens and grinds to flour. In the national standard, the moisture content of common flour is less than or equal to 14%. The moisture content of high gluten powder is less than 14.5%. Different customers have different requirements for water. We should have targeted processing water.

The amount of water added to each food processing workshop and noodles is basically constant, but the external environment changes greatly. In the process of food processing under different temperature conditions. The dough softening speed is different. For example, the water content of flour should be lower under the condition of high temperature and water temperature. It hardens the dough and slows down the softening process. So in late spring, early summer and autumn, the water-saving points should be lower, and in cold weather, the water-saving points should be higher.

There was a great deviation in the water-eating ability of different wheat varieties. This is due to the quality of gluten. The absorptive capacity of gluten is at least 1:1.6. The highest: 1:2.7. The wheat gluten with low soft bulk density and unsaturated grain absorbed less water and was easy to soften. If wheat with high hard bulk density and full grains has strong water absorption ability. The dough is quite stiff. New wheat gluten has not yet been fully formed. That is to say, the ripening period is not enough. He also tends to soften.

That is to say, the water content of flour is higher when processing wheat with high hard bulk density and full grain. The moisture content of new wheat flour processed with soft, low bulk density and unsaturated grains is lower. In addition, the deviation of water absorption ability of each part of wheat grain is relatively large. The central part of wheat has strong water absorption ability, and the more dependent it is on the periphery, the worse it is. In the process, the front core grinding flour has strong water absorption ability.

That is to say, the moisture content of wheat flour with different qualities should be different. The same wheat has different identities under different climatic conditions. Flour in different technological positions has different water absorption capacity, which can be chosen according to the requirements of flour quality. Only by knowing how much water is added to wheat and in different seasons can you ensure the stability of your flour.

Our Hongdefa have more than ten engineers with more than 30 years’ experience for flour milling machine. And have many successful flour mill project in all over the world.

In Ethiopia install 120T/24h wheat flour milling machine

80T/24H wheat flour mill plan in Ethiopia

Afghanistan 300T/24H wheat flour mill

South Africa 1500T/24H flour mill machine

If you have any question about the wheat flour mill processing or want to know more about our flour milling machines, welcome freely contact with us:

Cel/WhatsApp/Wechat: +86 139 3306 8531
Email: vanisa@hdfmill.com

Web: www.maizewheatmill.org

#cleaningtechincalflourmill #millingtechnicalflourmill #wheatflourmill #flourmillingmachine #wheatflourmillingmachine #flourmillingline #hongdefa


Hongdefa Flour mill team will attend SAHARA — 2018.9.5

SAHARA, the 31st International Agricultural Exhibition for Africa and the Middle East Egypt International International Center CAIRO – EGYPT Sunday to Wednesday, 16-19 September 2018.

sahara
sahara
Get price and more details

Hongdefa team will come to Cairo, Egypt for the SAHARA exhibition in September for wheat flour mill and maize flour mill business from 16 September to 19 September 2018. Would you like to meet us in Cairo? The details as follows:
Name of exhibition hall: Egypt International Convention Centre
Address:Mehwar el Moshir
New Cairo
New Cairo Exhibition Center
Egypt

Get price and more details
Exhibition Map
Exhibition Map

SHIJIAZHUANG HONGDEFA MACHINERY CO., LTD
HALL NO.: 2
Stand NO.: C107
From 16 SEP to 19 SEP,2018

Hongdefa stand
Hongdefa stand
Get price and more details

Welcome to attend the Exhibition and meet with us here !

hongdefa-factory
hongdefa-factory
Get price and more details

 


Shijiazhuang Hongdefa Machinery is the best choice for flour mill–20180830

Hey there welcome to Shijiazhuang Hongdefa Machinery Co.Ltd. We are your best choice manufacturers of wheat, maize and corn flour grinding mills.

1 hongdefa factory
1 hongdefa factory

We have more than 30years of experience and our machines have been installed all around the world . You can be rest assured that with us you can never go wrong.

2 hongdefa
2 hongdefa

Today we look back and go over the advantages that keep on adding on top of each other on why you should establish yourself with Shijiazhuang Hongdefa Machinery Co.Ltd.

3 why choose Hdf
3 why choose Hdf
4 why choose HONGEFA
4 why choose HONGEFA

Firstly like we have already listed above we have vast years of experience and like they say experience is the greatest teacher which means that by now Hongdefa Machinery is the master when it comes to maize wheat grinding manufacturing and distribution.

5 installed flour mill
5 installed flour mill
6 flour mill installed
6 flour mill installed

To further support this notion we have installed our maize wheat flour grinding mills of different capacities from small scale to commercial large scale in more 30 different countries in the world .This shows how universal our brand is and how reliable our service is.

6 HONGDEFA client
6 HONGDEFA client

Shijiazhuang Hongdefa Machinery is a certified international brand with all the certifications required . We have been awarded with various awards over the past years as well. The quality and efficiency of both our products and our service have been tested and applauded  as supported by the certification you see below.

7 clients
7 clients

Clients who have traded with us before can testify that choosing Shijiazhuang Hongdefa Machinery was the best choice they made.

8 certificate
8 certificate

What makes our milling machines so superior? One might ask. When we manufacture our machines a lot of processes are involved. Firstly a deep and thorough  research and development is conducted then a special team of experienced professional technicians design the grinding mill.

9 Hongdefa team
9 Hongdefa team
10 sales team
10 sales team

The best technology gathered from all around the world is used to build up the grinding mill and finally an excellent sales team is there to serve you with the best milling machine in the world. Choose wise today choose Shijiazhang Hongdefa Machinery.

11 hongdefa team
11 hongdefa team

Lastly but not least Shijiazhuang Hongdefa Machinery is very convenient and reliable to trade with.

12 branch office 2
12 branch office 2

We have branches in Zambia Uganda Ethiopia and have agent in Kenya Brazil and Australia to serve at your convenience and to bring the service closer to your doorstep.

13 branch office
13 branch office

Our aftersale service is an excellent package and a topic for another day .

 


flour mill machine

The 60 tons per 24h wheat flour mill machine is being installed for Algerian client

In Shijiazhuang Hongdefa Machinery, the wheat flour mill machine is another product on our product range. Our company has supplied the wheat flour milling machine to several countries across the world.The wheat flour mill machine processes wheat to produce fine wheat flour for bread, biscuits, chapati and a wide range of other wheat products.The wheat flour milling machine comes in different capacities ranging from the 5tonne/24hr to the 800tonne/24hr. The wheat flour machine can also be ordered with specifications to suit our clients’ preferences. And our wheat flour mill machine is very popular with African clients.

flour mill machine
The factory of flour mill machine

Recently, we have a set of 60t wheat flour mill machine is being installed in Algeria, which uses the pneumatic roller mill, plansifters, PLC control system technology. For this 60t/24h wheat flour mill machine from HDF Machinery, I have the following information to share with you.

1.Total length of the roller:8000mm

2.Capacity(wheat/24h):60-80T/24h

3.Flour extraction: To produce standard flour:75-82%                                                                                            To produce grade 2flour: 72-75%                                                                                                To produce grade 1flour: 60-68%

4.Flour quality: Obey the people’s republic of China’s GB1355-88 standard         Volume weight /g/L                                                                                                                       Faultiness grain content /%                                                                                                        Impurity content /% Mineral content /%                                                                            Moisture content /%                                                                                                           Odor content /%                                                                                                                     ≥750 ≤6.0 ≤1.0 ≤0.5 ≤13.5 natural                                                                                 Ash:to produce grade 2 flour: 0.80%(dry weight) to produce grade 1 flour:   0.70%(dry weight)

  1. Power supply: 251.72KW
  2. Container: 40’HQ× 5
flour mill machine
60 tons per 24h wheat flour mill machine
Get price and more details

 

The wheat flour mil machine complete line is made up of the cleaning section, milling section and the packaging section.

Cleaning section

1.Beat :This is to eliminate all the dirt like dust, bacteria and insect seed.

2.Sceening: This is to remove large and small impurities.

3.Destoner: To remove stones.

4.Magnetic separator: Remove all metal material in the wheat.

5.Dampener: This is ensure the bran’s integrity during the milling process.

flour mill machine
cleaning section of flour mill machine

Milling Section

1.Roller mill:To break the integrity by roller movement.

2.Sifter: For separation of the flour and the bran and also to separate large size from small size for quality provision.

Packaging Part

This is made up either of the auto packing machine or the manual packing machine depending with the client’s preferences.

flour mill machine
packing machine of flour mill machine

 

Get price and more details

 

If you buy a flour milling machine from our Hongdefa Machinery, we will provide you with a comprehensive after-sales service system. You will enjoy these benefits:

  1. Two years spare parts delivery together with the machine

2.over sea service center available, 24h after service:                                                            Lusaka Zambia, Ethiopia,Multan Pakistan                                                                              Durban South Africa,New Delhi India

3.Warranty 2years

4.Chinese professional engineer guide installation and commissioning.

flour mill machine
60 tons per 24h wheat flour mill machine from HDF Machinery
Get price and more details

 

If you are interested in our wheat flour mill machine, contact me freely:

Cell/WhatsApp/: +8613833461840

 

Or click www.maizewheatmill.org for more details and price about flour mill machine.

Thanks!

Vanisa


flour mill machine

The installation experience of wheat flour mill machine

Wheat Flour mill machinery, there is many machines and between the machine have connection. In order to improve work efficiency, improve the quality of the project, carefully read the drawings before installation, inspection site, in order to determine the better construction program. The operation of the process to fully integrate the actual situation on the scene, rather than blindly according to the design drawings for cutting and equipment layout. At the same time, construction must pay attention to the safety of personnel and equipment.

high quality of wheat flour mill machine
wheat flour mill machine

National Development and Reform Commission, Ministry of Industry and Information Technology released the “food industry” second five “development plan” is expected by 2015 to deal with wheat 400t / d above the proportion of enterprises will increase to more than 65% Increase by 15 percentage points, the author of these years involved in the installation and commissioning of the flour mill single line of the daily processing capacity has reached a minimum of 400t / d, and at least two production lines at the same time boot. This trend of development to the flour equipment installation industry has brought great opportunities for development, but also to the installation work put forward higher requirements, bringing greater challenges.

Get price and more details

 

1.Flour equipment installation requirements and the difficulty
The quality of the installation project not only to meet the national and industry standards, such as: GB50300-2013 “construction quality acceptance of a unified standard”, GB 50231-2009 “mechanical equipment installation and acceptance of the general norms”, but also to meet the construction The special requirements of the unit. In ensuring the use of functions, operation and inspection and maintenance of the premise, the enterprise will be on the overall external appearance of the demanding requirements. We may one-sidedly believe that the installation of equipment is nothing more than in accordance with the layout of the main map, auxiliary equipment in place fixed, according to profile, elevation to determine the direction and elevation of the pipeline can be. In fact, not yet, because there is no specific food machine equipment for the installation of standards and norms, the installation process a lot of practices are drawing on the experience of other projects to operate. This requires practitioners with a wealth of experience in installation and commissioning. In addition, because the flour mill of each device is not isolated, and its front and rear, up and down, are related to the equipment with the match, which requires the installation staff to have a global view, before proceeding to establish the overall idea of ​​installation, Clear the connection between the equipment, must not blindly start. Flour mill installation difficulty is mainly concentrated in the following two aspects: First, the process is complex, many channels. Modern milling process to promote light grinding subdivision, strengthen the classification, especially the high-sieve outlet between the powder pipe, with “so much” to describe it is not too much, but also with a lot of tee and fighting, the pipeline not only Easy to get wrong, and there may be between the pipeline space conflict. Another major reason is that the flour mill pipeline has the installation angle requirements. As the flour mill raw materials, finished products, finished products and by-products have their own self-slip angle (wheat 27 ~ 31 °, milling intermediate 37 ~ 44 °, standard powder 40 ~ 44 °, bran 37 ~ 40 °) , Therefore, the first task of pipeline installation is to ensure that the material can be smooth in which circulation, followed by consideration of beauty.

  • Examples of flour mill equipment installation 

1) Output screw under the bin of clean section

Construction drawings tend to mark the installation height of the conveyor and the installation location, which are understandable, but also a complete design drawings indispensable. However, the installation staff may be based on profile, elevation drawings made in advance of the size of the conveyor belt, while ignoring the actual situation of the scene. The size of the drawings is an ideal condition, but the construction of the building will inevitably produce some changes (floor thickness error, the bottom of the ground elevation error, etc.), and sometimes even a more substantial change, so as to give Subsequent equipment installation work is difficult. In order to prevent the material from flowing out of the automatic classification phenomenon, clean up the wheat warehouse is often designed as a multi-export form, all the export of the slip pipe pool to a bucket and then by the wheat into the screw conveyor, so the top of the conveyor to leave enough Height is used to install the collection bucket and with wheat, but the conveyor can not be installed too low, because it also down the hoisting machine feeding. So the conveyor height of the conveyor to meet the wheat from the slip angle of the premise can be installed as low as possible in order to collect the bucket and with the wheat to leave enough space, but also to facilitate the daily management and maintenance, and unnecessary According to the height of the drawings marked to the production and installation.

 

Get price and more details

2) Input conveyor at the top of the bin installation

General  roof are open-air, reserved holes can not be arbitrarily changed, changes may lead to the warehouse into the water, resulting in mildew of grain. On the other hand, the current capacity of the vertical silo are in the direction of large-scale development, is often tens of thousands of tons of capacity, due to the large number of target storage, transport distance is longer, scraper scraper is often arranged in sections, by The former scraper back to a feeding, the same scraper material may be able to enter two rows or even more positions. In order to save the material, the scraper is often tilted, the inlet is low and the outlet is high, and each outlet has a slip tube and a pneumatic gate. The above technical requirements and characteristics of the scraper machine to fully determine the minimum installation height, below the minimum installation height to ensure that the wheat from the slip angle. Therefore, in determining the installation height of the scraper must be in advance to understand the actual situation at the scene (reserved hole position is correct, scraper material to enter the target, etc.), rather than blindly according to profile, elevation On the size of the production scale, if the civil construction process errors or errors may cause the actual installation height changes, rework time is a waste of material and labor-intensive.

3)Some machine installation Precautions

As the structure of the device itself and the working principle, the installation, one can not damage its vulnerable parts, two to ensure that its normal, stable work required for the basic conditions. Some precision equipment, such as measuring scales, gravity meters, balers, water control, etc., these devices are equipped with a sensing device, in the installation to avoid strong electric field, magnetic field and high temperature environment, welding or gas cutting Should pay attention to protection. In addition, the installation must be adjusted to a good level, installed firmly to avoid shaking to ensure its measurement accuracy, the equipment bracket or base to be self-contained, can not be shared with other stents or connected In order to ensure the accuracy of the sensor operation, such equipment requirements upstream The flow rate is stable, so the upper end of the general requirements are required to install the buffer bucket or buffer elbow to reduce the impact of incoming to ensure the stability of the flow. Take the water controller as an example

Bucket elevator hopper Level indicator level high/low  No work                                                                                                             ↓                                                                                                                                Micro process unit

                                                                                                          ↓                                                      Down-hopper Pneumatic valves    ← The electromagnetic valve←compress air

The traditional process of wheat and wheat are out of the “one clean” treatment by the hoist to the top, then enter the water control device to detect the real-time flow of wheat and the initial moisture content, the controller and then set the target Moisture content to determine the water machine water. From the control device to detect changes in the flow of wheat to indicate the change in the amount of water to change the amount of water will be less time, if the flow of incoming instability will lead to water is not accurate and thus affect the grinding and grinding effect. In addition, the water control device to detect the initial moisture content of wheat requires the hopper in the wheat level to maintain a certain height so that the detection probe can be detected, if the material is too high or too low, the hopper below the gate will be corresponding Adjust the opening degree of their

own in order to maintain the level of wheat in the hopper, if the upstream flow of the incoming flow can not be maintained at a stable level, then the gate opening degree will change frequently, the gate opening degree changes first identified by the probe Information feedback to the micro-red space may cause the hoisting machine blocking material, causing the system to stop. Such as the details are easy to be ignored, the drawings are also very difficult to fully express it, which gives managers and the quality of the installation staff made a high demand.

  • Safety when installation

The last and most important is the safety of the installation process, including personal and device safety. Welding, gas cutting should pay attention to the work below the staff and equipment, personnel leave the time to cut off the power and gas source, after get off work to arrange full-time staff to inspect. Personal safety is the most important, even if the

installation of the perfect flaw, if there is a security incident will be a vote veto. Especially in the early installation, equipment and pipelines are not in place, more holes reserved, be sure to do a good job of holes and edge protection and warning work, at the same time to strengthen the training, the construction workers to carry out safety education, improve its Own security awareness.

4 Total

Flour milling machine  installation requires practitioners with a global view and clear ideas, according to the actual situation of the scene to adjust the construction of the program flexibility, and not mechanically according to the design drawings for equipment and pipe connections. Under the basic premise to meet the functional realization, we should strive to make the equipment layout reasonable, the pipeline to the beautiful. Problems that are not found and resolved during the installation process are exposed during commissioning, especially when commissioning is carried out. Due to the material when the pipe material, this time the changes will cost more time and effort, so the installation must be taken seriously, to find and solve the problem, as far as possible in the installation to be handled, must not be opportunistic, only so When debugging can be done confidently, leisurely.

 

Get price and more details

If you any questions about  wheat flour mill machine, contact me with:

Cell/WhatsApp/: +8613833461840

Email:  maizewheatmill@gmail.com

Or click www.maizewheatmill.org to visit our website

Thanks!

Vanisa

 


high quality of maize mill machine running in Ethiopian

Running in Ethiopia’s maize mill machine

In Ethiopia we have running  flour milling machine of 36T/24H ,80t/24h,120t/24h, 500t/24h.

flour mill machine
maize flour mill machine
Get price and more details

 

The  maize machine can produce high quality super white corn flour, corn grits. In addition, our wheat equipment can also be produced good quality bread flour, cake flour . Is there any equipment you interested,contact me freely.

Cell: +8613833461840

Email:  vanisa@sjzafrica.com